top of page

Kekionga Middle School

Fort Wayne Community Schools

Fort Wayne, IN

Renovation

Project Description:

This design was an adaptive re-use renovation converting a media center into a band room and converting the band room and former shop room into a media center.


A unique steel drum instrumental program at the school provided the unique challenge of needing two instrumental areas in a single band room.  The existing media center which could be reduced in size due to the one to one computing initiative provided the appropriate dynamic and flexible space for the program’s needs.

Contact KStahl@moakepark.com for more information

© 2025 Moake Park Group, Inc.  All rights reserved.

Moake Park Group, Inc.

7223 Engle Rd. | Suite 200 | Fort Wayne, IN | 46804

Tel: 260-424-6516

bottom of page