top of page

Kekionga Middle School

Fort Wayne Community Schools

Fort Wayne, IN

Renovation

Project Description:

This design was an adaptive re-use renovation converting a media center into a band room and converting the band room and former shop room into a media center.


A unique steel drum instrumental program at the school provided the unique challenge of needing two instrumental areas in a single band room.  The existing media center which could be reduced in size due to the one to one computing initiative provided the appropriate dynamic and flexible space for the program’s needs.

Contact KStahl@moakepark.com for more information

mpg_horiz_edited.png
bottom of page